Getting on ship Oriana P&O at Port Everglades
The 08th of March & the start of the final leg of our incredible journey, we cruised home from Port Everglade in Florida to Southampton on P&O cruise ship Oriana.
We arrived at the boat & prepared to load the bikes onto the ship, seen here discussing the logistics with Tim Holton, Staff Chief Engineer.
One onto the ship we rode the bikes up the ‘M1′ ( the main service corridoorthat runs the full length of the ship ) to the storage cage..
